ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
Download
Publications Copernicus
Download
Citation
Articles | Volume VI-4/W1-2020
https://doi.org/10.5194/isprs-annals-VI-4-W1-2020-61-2020
https://doi.org/10.5194/isprs-annals-VI-4-W1-2020-61-2020
03 Sep 2020
 | 03 Sep 2020

IMPACT OF INFORMATION MANAGEMENT DURING DESIGN & CONSTRUCTION ON DOWNSTREAM BIM-GIS INTEROPERABILITY FOR RAIL INFRASTRUCTURE

G. S. Floros, P. Ruff, and C. Ellul

Related authors

LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE
G. S. Floros and C. Ellul
ISPRS Ann. Photogramm. Remote Sens. Spatial Inf. Sci., VIII-4-W2-2021, 83–90, https://doi.org/10.5194/isprs-annals-VIII-4-W2-2021-83-2021,https://doi.org/10.5194/isprs-annals-VIII-4-W2-2021-83-2021, 2021
DEVELOPING IFC FOR INFRASTRUCTURE: A CASE STUDY OF THREE HIGHWAY ENTITIES
G. S. Floros, G. Boyes, D. Owens, and C. Ellul
ISPRS Ann. Photogramm. Remote Sens. Spatial Inf. Sci., IV-4-W8, 59–66, https://doi.org/10.5194/isprs-annals-IV-4-W8-59-2019,https://doi.org/10.5194/isprs-annals-IV-4-W8-59-2019, 2019